You Searched for: mumbai traffic
Mumbai-Nagpur Expressway Complete: Final 76km Stretch Opens, 8-Hour Travel Time

Maharashtra completes 701km Mumbai-Nagpur Expressway with final 76km stretch opening. Travel time reduced to 8 hours, featuring India's longest 8km highway tunnel and smart traffic systems.

By Admin

  • 10th Jun 2025
  • 1143 Views
Vashi Creek's New Six-Lane Bridge Revolutionizes Mumbai-Navi Mumbai Commute | Ghar.tv

New six-lane Vashi Creek bridge opens, transforming Mumbai-Navi Mumbai commute. ₹559 crore TCB-3 project doubles traffic capacity, reduces congestion, boosts real estate growth in MMR region.

By Admin

  • 7th Jun 2025
  • 1139 Views
Mumbai Coastal Road Tunnel Opens: Dadar to Nariman Point Travel Now Smoother Than Ever

Mumbai’s new Coastal Road tunnel connecting JK Kapur Chowk to Worli is now open. The 550m tunnel cuts travel time from Dadar and Prabhadevi to Nariman Point, easing traffic and improving coastal connectivity.

By Admin

  • 2nd Jun 2025
  • 1170 Views
New Bhayandarpada Flyover Set to Transform Travel Between Mumbai and Thane

Bhayandarpada Flyover inaugurated on Ghodbunder Road, Thane. It promises 15–25 mins travel time reduction and seamless metro integration for smoother commutes.

By Admin

  • 16th May 2025
  • 1316 Views
Marine Drive Reimagined - MMRDA's Bold Move to Transform South Mumbai's Commute and Skyline

MMRDA is set to redefine Marine Drive with a proposed six-lane coastal road and twin tunnel project - aimed at easing congestion, boosting connectivity, and reshaping South Mumbai’s real estate future.

By Admin

  • 12th Apr 2025
  • 1340 Views
BMC to Launch Smart Parking App to Curb Mumbai’s Growing Street Parking Chaos

BMC is launching a smart parking app to help Mumbai motorists find and book slots in public parking lot - aiming to reduce on-street parking and ease traffic congestion.

By Admin

  • 23rd Mar 2025
  • 1231 Views
Atal Setu to Remain Closed for 13 Hours for MMRDA Atal Setu L&T Marathon

Mumbai’s Atal Setu will remain completely closed from 11 PM on Jan 15 to 1 PM on Jan 16 for the MMRDA Atal Setu L&T Marathon. Commuters traveling to Navi Mumbai, Pune, and JNPT must take alternative routes via Sion-Panvel Highway & Thane-Belapur Road to avoid disruptions.

By Admin

  • 15th Feb 2025
  • 1373 Views
Mega Thane Infrastructure Projects - INR 20,000 Crore Boost for Regional Connectivity

MMRDA’s INR 20,000 crore projects—a tunnel and elevated road—aim to transform Thane’s connectivity and ease traffic in the Mumbai Metropolitan Region.

By Admin

  • 5th Jan 2025
  • 1559 Views
Santacruz-Chembur Link Road Extension Nears Completion

The long-awaited Santacruz-Chembur Link Road extension is set to transform connectivity, bringing Mumbai one step closer to smoother and faster commutes.

By Admin

  • 28th Dec 2024
  • 1363 Views
Introducing High-Tech Solutions For Mumbai Parking Problems

Mumbai tackles parking woes with robotic towers, including a 14-story facility at Mumbadevi, and 500 new on-street options to manage over 4.3M vehicles.

By Admin

  • 4th Dec 2024
  • 1314 Views
Mumbai's Coastal Road Project to Unveil New Sea Link, Promenade, and Parking in 2024

Mumbai's ambitious coastal road project reached a milestone this week when the 44-meter length linking the northbound coastal road to the Worli sea connection was erected. This improves city connections, although project completion is projected to take place next year.

By Admin

  • 12th Nov 2024
  • 1431 Views
Another Step to a Seamless Mumbai - Coastal Road's Final Bridge Span Set to Transform Connectivity with Bandra-Worli Sea Link

As the last span of the northbound Mumbai Coastal Road is installed, it will connect smoothly to the Bandra-Worli Sea Link (BWSL). The 44-meter bridge span arrived in Worli on Monday from Karanja Port in Navi Mumbai, ready for deployment on Tuesday with a backup on Wednesday.

By Admin

  • 5th Nov 2024
  • 1389 Views
Malad Mith Chowky Flyover Opens Partial Access on October 6th, 2024 - A Relief for Motorists Amid Traffic Woes

After 2.5 years of construction, the west-to-east Mith Chowky flyover in Malad will open to automobiles on Sunday, October 6, 2024. For cars driving from Marve and Malwani to Malad railway station, this partial opening might alleviate traffic at the bridge intersection.

By Admin

  • 6th Oct 2024
  • 1458 Views
Strategic Bridge Construction Set to Relieve Ghodbunder Road Traffic Problems

In a significant push to ease traffic on Ghodbunder Road, a notorious bottleneck for motorists traveling from Mumbai, Thane, and beyond toward Nashik, Gujarat, and Konkan, the Mumbai Metropolitan Region Development Authority (MMRDA) has accelerated the development of alternative routes.

By Admin

  • 21st Sep 2024
  • 1507 Views
Innovative Parking Hub at Dahisar Toll Naka - A Game Changer for Mumbai's Traffic Flow

Mumbai will build a modern inter-state parking hub on the Dahisar toll naka site. The Municipal Corporation of Greater Mumbai (MCGM) hopes to reduce traffic in Mumbai by providing parking for drivers from outside the city.

By Admin

  • 19th Sep 2024
  • 1378 Views
Subscribe to our Newsletter

Get regular updates on news, analysis, trends & more on the real estate industry for free.