You Searched for: mmrda infrastructure project
Chembur metro station opening targets infrastructure efficiency

The Chembur metro station opening marks a pivotal shift for Mumbai transit as the Mumbai Metropolitan Region Development Authority accelerates infrastructure.

By Rajesh Aher

  • Apr 26, 2026 15:01 PM IST
  • 1203 Views
Mumbai 3.0 Project: MMRDA Secures 216 Acres in Raigad

The Mumbai 3.0 project marks a milestone as the MMRDA secures 216 acres in Raigad, demonstrating a successful participatory model for urban economic growth.

By Archana Panchal

  • Apr 21, 2026 11:35 AM IST
  • 1193 Views
Third Mumbai land acquisition accelerates across 124 Raigad villages

Third Mumbai land acquisition has officially commenced across 124 Raigad villages, as MMRDA moves forward with the ambitious Karnala-Sai-Chirner project.

By Kinjal

  • Apr 18, 2026 11:33 AM IST
  • 1253 Views
Thane-Borivli tunnel project launches to boost regional connectivity

The Thane-Borivli tunnel project launches in Mumbai, marking a major infra milestone to enhance east-west connectivity across the metropolitan region today.

By Anjana Sastri

  • Apr 08, 2026 14:02 PM IST
  • 1188 Views
Mumbai Elevated Corridor Clears Chawl Land Acquisition Bottleneck

Mumbai elevated corridor demolition confirms critical progress on the Sewri-Worli link, impacting local real estate.

By Tejas Parkar

  • Mar 29, 2026 19:31 PM IST
  • 1243 Views
MMRDA Land Transfer Unlocks Infrastructure Funding Potential

MMRDA land transfer unlocks significant asset backing for large infrastructure projects across Thane, Raigad, and Palghar districts.

By Tejas Parkar

  • Mar 26, 2026 15:32 PM IST
  • 1235 Views
MMRDA Unveils ₹48,072 Crore Budget for 2026–27 with 87% Infrastructure Focus and ₹4,000 Crore Mumbai 3.0 Push

MMRDA has announced a record ₹48,072.5 crore budget for 2026–27 — its first surplus in nine years — allocating 87% to infrastructure and ₹4,000 crore for the Karnala–Sai–Chirner new town under the Mumbai 3.0 expansion plan.

By Priya Kataria

  • Feb 20, 2026 17:06 PM IST
  • 1263 Views
Andhra Pradesh Adopts Mumbai's CIDCO-MMRDA Framework to Build Self-Financed Vizag 2.0 and Bay City Projects

Andhra Pradesh adopts Mumbai's CIDCO-MMRDA urban planning model for Vizag 2.0 and Bay City projects. Learn how land monetisation, value capture financing, and transit-oriented development will shape Visakhapatnam's transformation into a self-financed global urban hub by 2047.

By Admin

  • 19th Jan 2026
  • 1214 Views
MMRDA Confirms December 2027 Deadline for Atal Setu Connectors; South Mumbai-Pune Travel Time to Drop by Up to 90 Minutes

MMRDA has announced that two six-lane elevated corridors connecting Atal Setu to the Mumbai-Pune Expressway and Navi Mumbai International Airport will be operational by December 2027, promising to slash South Mumbai-Pune travel time by up to 90 minutes.

By Admin

  • 13th Dec 2025
  • 1562 Views
₹8,000 Crore Metro Line 10 Tender Set to Launch by Mid-December: Thane-Bhayander Corridor Takes a Leap Forward

Maharashtra Transport Minister announces Metro Line 10 tender launch by December 15, 2025. The ₹8,000 crore elevated corridor connecting Gaimukh to Shivaji Chowk aims to decongest Ghodbunder Road and transform Thane-Mira Bhayander connectivity by 2029.

By Admin

  • 9th Dec 2025
  • 1320 Views
Mumbai Plans 3 km Underground Pedestrian Tunnel Network to Strengthen Metro Line 3 Connectivity

Mumbai to develop a 3-kilometre underground pedestrian tunnel network connecting BKC and Worli stations on Metro Line 3, enhancing last-mile connectivity and seamless interchange with the upcoming bullet train terminal.

By Admin

  • 30th Nov 2025
  • 1283 Views
MMRDA Greenlights ₹58,754 Crore Uttan-Virar Sea Link Project with 5-Year Completion Target

MMRDA has approved the ₹58,754 crore Uttan-Virar Sea Link, a 55-kilometre coastal corridor project connecting Mumbai's western suburbs to Palghar-Virar with a 60-month completion deadline.

By Admin

  • 29th Nov 2025
  • 1256 Views
MMRDA Issues ₹36 Crore Tender to Revive Thakurli Flyover After Seven Years of Stalled Progress

MMRDA has issued a fresh ₹36 crore tender to restart the long-stalled Thakurli Flyover project in Kalyan-Dombivli, aiming to ease traffic congestion and boost regional connectivity after seven years of delay.

By Admin

  • 29th Nov 2025
  • 1336 Views
MMRDA Launches ₹8,498 Crore Ghatkopar Slum Redevelopment: Mumbai's Largest Rehabilitation Project Breaks Ground

MMRDA and SRA have launched the ₹8,498 crore redevelopment of Ramabai Ambedkar Nagar and Kamraj Nagar in Ghatkopar—Mumbai's largest slum rehabilitation project spanning 31.8 hectares with over 17,000 homes, marking a transformative milestone in inclusive urban development.

By Admin

  • 15th Oct 2025
  • 1860 Views
Maharashtra Explores 4-Kilometer Extension of Borivli-Thane Tunnel to Link with Coastal Road Network

Maharashtra government evaluates extending the under-construction Borivli-Thane tunnel by four kilometers to connect with the Saket-Gaimukh Coastal Road, aiming to reduce traffic congestion and improve connectivity across the Mumbai Metropolitan Region.

By Admin

  • 5th Oct 2025
  • 1509 Views
Subscribe to our Newsletter

Get regular updates on news, analysis, trends & more on the real estate industry for free.