Submission of Bids For the Virar-Alibaug Corridor and Pune Ring Road is Great News For Connectivity

user Admin
  • 29th Jun 2023
  • 1732
  • 0
 Submission of Bids For the Virar-Alibaug Corridor and Pune Ring Road is Great News For Connectivity
Never miss any update
Join our WhatsApp Channel

Virar-Alibaug corridor and Pune Ring Road 

The Maharashtra State Road Development Corporation (MSRDC) has won the proposal for the Virar-Alibaug multimodal corridor (VAMMC) in Mumbai, which is a significant development for transit connectivity in the Mumbai Metropolitan Region (MMR).

The Rs 60,000 crore project will encompass a nearly 100-kilometer eight-lane motorway with provisions for future Metro rail connectivity. In the bidding procedure for the corridor, as well as the Pune Ring Road and the Samruddhi Motorway Extension, 28 infrastructure corporations, including L&T and Afcons, participated. 

Vasai, Bhiwandi, Kalyan, Ambernath, Panvel, Uran, and Pen will be traversed by the VAMMC. It will primarily serve as a connection between the under-construction Navi Mumbai International Airport, the JNPT Port, the Mumbai Trans Harbour Link (MTHL), and a goods corridor. The project is anticipated to reduce travel time between Virar and Alibaug by fifty percent, and because it will pass through the Mumbai- Satara Highway, it will serve as a short-cut between various areas in the Mumbai Metropolitan Region (MMR) and Goa. Pune's Ring Road will be a 137-kilometer access-controlled motorway. 

The Rs 34,000 crore project will not only bring Mumbai closer to the interior parts of Pune-drivers will be able to use the ring road to reach their destinations rather than getting stuck in traffic in the middle of the city-but it will also provide connectivity to the talukas of Khed, Haveli, Purandar, Bhor, Mulshi, and Maval. In Kakandi, the Samruddhi Extension will begin at the 500-kilometer mark near Jalna and connect to the Nanded-Degloor National Highway. Additionally, it will intersect with the proposed motorway traversing Jalna-Parbhani and Nanded. The estimated cost of the endeavour is 22,000 crore rupees.


Related Topics / Tags

Admin

Author

Admin

...


Comments

Add Comment

No comments yet.

Add Your Comment

Relevant Blogs

Infrastructure
5 Foreign Universities Launch Navi Mumbai Campuses 2027: Mumbai 3.0 Education Revolution Drives Real Estate Investment Boom

Mumbai has evolved through distinct phases. Mumbai 1.0 was the colonial trading hub. Mumbai 2.0 became India's financial capital. Now, Mumbai 3.0 is e

Infrastructure
Khopoli's Rise Begins: The MISSING LINK That Turns a Transit Town into a Strategic Hub

As the Mumbai–Pune Expressway's biggest upgrade nears completion, Khopoli is gearing up for a transformation—one that could redefine real

Infrastructure
5 Reasons Why THIRD Mumbai and FOURTH Mumbai Will Revolutionize India's Financial Capital

Mumbai, the financial powerhouse of India, is undergoing a transformation like never before. As part of the ambitious plan to decongest and expand Mum