Jaipur Metro Phase 2 Set to Link Sitapura and VKI with 36-Station Corridor by 2030
- 3rd Jun 2025
- 1163
- 0
Never miss any update
Join our WhatsApp Channel
In a strategic move set to modernize Jaipur’s transit landscape, the Rajasthan government has advanced plans for Jaipur Metro Phase 2, a project that will connect Sitapura in the south to the VKI Industrial Area in the north. Officials stated that the new metro corridor aims to decongest roads, enhance public mobility, and fuel economic activity across the Pink City’s most crucial industrial and institutional zones.
Metro Stretch, Stations, and Scope
The proposed Phase 2 will span a total distance of 42.8 kilometers, featuring 36 stations—34 elevated and 2 underground—between Todi Mod and Prahladpura. Managed by the Rajasthan Metro Rail Corporation (RMRC), the project is expected to become a game-changer for both daily commuters and industrial logistics once completed.
- Total length: 42.8 km
- Total stations: 36 (34 elevated, 2 underground)
- Estimated cost: ₹12,260 crore
Strategic Funding Model in Place
The financing blueprint ensures minimal strain on state finances. Reports indicate that 20% of the funding will come from the state government, another 20% from the Centre, and the remaining 60% through financial institutions such as the Asian Development Bank (ADB) and Asian Infrastructure Investment Bank (AIIB). This combination is designed to provide long-term financial sustainability while ensuring global quality benchmarks.
Connecting Industrial and Institutional Nerve Centers
Planners highlighted that Phase 2 would not only link two major industrial zones—VKI and Sitapura—but also provide seamless access to prominent landmarks such as Jaipur International Airport, SMS Hospital, Sawai Mansingh Stadium, and several interstate bus terminals. Government buildings like the Jaipur Collectorate will also lie along the corridor, enhancing administrative accessibility for citizens.
Construction Timeline and Government Approvals
The Detailed Project Report (DPR) has already received approval from Rajasthan’s Chief Minister and is now with the Ministry of Housing and Urban Affairs. As per preliminary estimates, construction could begin between August and October 2025, with a five-year completion timeline. By 2030, Jaipur could well be home to one of India’s most efficiently connected industrial corridors.
Smart Infrastructure and Depot Facilities
Planners are also focusing on automation and sustainability. The Sitapura depot, spanning 27 hectares, will house state-of-the-art maintenance infrastructure. The system will incorporate CBTC (Communication-Based Train Control) technology and Unattended Train Operation (UTO), placing Jaipur alongside metro networks in cities like Delhi and Bengaluru in terms of technological sophistication.
Commuter Benefits: Time, Cost, and Comfort
From reduced commute times to lower travel costs, the Phase 2 corridor is expected to significantly improve urban life for students, professionals, and business owners. The shift from road to rail will also help cut down pollution, relieve traffic congestion, and promote the use of green public transport solutions.
Economic and Environmental Impact
Driving Growth and Investment
Urban economists believe the corridor will act as a magnet for industrial growth, streamline logistics, and cut supply chain delays. It is also anticipated to generate thousands of jobs during the construction phase and in ongoing operations, boosting the region’s employment rate and commercial appeal.
Promoting Sustainability
The project is expected to greatly reduce Jaipur’s dependency on personal fuel-based vehicles, thus lowering greenhouse gas emissions and enhancing urban sustainability. Experts view this as a critical step in Jaipur’s transition to becoming a green, future-ready city by 2030.
Conclusion
Jaipur Metro Phase 2 is not merely a transport project; it is an urban development catalyst. By integrating mobility, economic potential, and sustainability into one project, it marks a significant leap toward a smarter, more accessible Jaipur. Residents, investors, and policymakers alike are viewing this corridor as the foundation for Jaipur’s next decade of growth and opportunity.
Disclaimer: This news article is based on publicly available information and official statements at the time of writing. Project details, timelines, and costs may be subject to change based on future government notifications or project developments.
Comments
No comments yet.
Add Your Comment
Thank you, for commenting !!
Your comment is under moderation...
Keep reading blogs