Brihanmumbai Municipal Corporation Announces ₹2,200 Crore Infrastructure Tender for Malad West Connectivity Enhancement

user Admin
  • 3rd Oct 2025
  • 1358
  • 0
Brihanmumbai Municipal Corporation Announces ₹2,200 Crore Infrastructure Tender for Malad West Connectivity Enhancement
Never miss any update
Join our WhatsApp Channel

The Brihanmumbai Municipal Corporation has issued a tender worth ₹2,200 crore aimed at addressing severe traffic congestion issues in the Malad West region of Mumbai. The ambitious project encompasses the construction of two major bridges, an elevated road system, and critical connectivity improvements.

According to Additional Municipal Commissioner for Projects, Abhijit Bangar, the infrastructure initiative has been strategically designed to strengthen linkages between residential neighborhoods, arterial roads, and the Mumbai Coastal Road network.

Major Components of the Infrastructure Development Plan

The comprehensive tender includes multiple infrastructure elements designed to transform connectivity in the region:

Project Element Details
Vehicular bridge From Lagoon Road to Infiniti Mall, connecting Malad West to Malvani
Elevated road Over Ramchandra nullah, linking MDP Road to Ryan International School
Additional traffic arm From Charkop junction to Ryan International School
Road widening Malad–Marve Road widened by 3.65m, from Mahakali Nagar Junction up to Mith Chowky near Giridhar Park

Expected Impact on Regional Connectivity

The proposed Lagoon–Infiniti Mall bridge is anticipated to significantly improve vehicular movement between the densely populated areas of Malad West and Malvani, officials stated.

The elevated road structure planned over Ramchandra nullah will serve as a critical link for internal routes, facilitating smoother traffic flow between Evershine Nagar and Atharva College areas. This development is part of a larger infrastructure transformation initiative across the Mumbai metropolitan region.

The road widening component of the project is expected to substantially enhance traffic flow toward the congested Marve-Mith Chowky corridor, which currently experiences significant bottlenecks during peak hours.

Political Backing and Administrative Support

The infrastructure project has received strong political support, with Union Minister and North Mumbai Member of Parliament Piyush Goyal consistently advocating for infrastructure enhancements to address the area's increasing vehicular load. Sources indicated that the MP has been actively following up with civic authorities to expedite the tender process.

Infrastructure Development Context

This tender represents another significant step in the city's ongoing efforts to modernize its transportation infrastructure. The BMC has been actively pursuing multiple large-scale infrastructure projects across various Mumbai suburbs to address growing urbanization challenges.

The development comes at a time when Mumbai's western suburbs are experiencing rapid growth, creating an urgent need for enhanced connectivity solutions. Similar initiatives in other parts of the city, including infrastructure developments along Mumbai's eastern corridor, have demonstrated positive impacts on local real estate markets and quality of life.

Industry experts suggest that such infrastructure investments typically have far-reaching implications for property values and investment opportunities in the surrounding areas, making them attractive for both residential and commercial development.

The ₹2,200 crore tender is expected to position Malad West for substantial infrastructure modernization, aimed at reducing traffic congestion while enhancing both east-west and north-south connectivity in one of Mumbai's most densely populated suburban regions.

Disclaimer: This article is based on information available from official sources as of October 2025. While every effort has been made to ensure accuracy, readers are advised to verify specific details with the Brihanmumbai Municipal Corporation or relevant authorities before making any decisions based on this information. Infrastructure project timelines, budgets, and specifications are subject to change based on administrative decisions and ground realities.


Related Topics / Tags

Admin

Author

Admin

...


Comments

Add Comment

No comments yet.

Add Your Comment

Relevant Blogs

General
Brookfield to Invest ₹9,000 Crore in Developing Asia's Largest Global Capability Centre in Powai, Mumbai

In what is being described as a transformative development for Maharashtra's commercial real estate landscape, Brookfield Asset Management has reporte

General
Ashiana Housing's Vishal Gupta Takes Charge as CREDAI-NCR President with Reform-Driven Agenda

In a significant leadership transition for the northern real estate sector, Vishal Gupta, Managing Director of Ashiana Housing, has reportedly been el

General
Casagrand Makes International Debut with ₹1,000 Crore Luxury Project in Dubai Islands

Chennai-based real estate developer Casagrand has reportedly taken a significant step into the global property market by launching its first internati